Progress Photographs During 3rd week of August-2026

53+400 ROB LHS A1 Abutment Dirt Wall bracket Shuttering work in progress

53+400 ROB LHS A2 side Gap slab staging and fly board fixing work in progress

39+940 MJB LHS P2 to P1 & P1 to A1 deck slab top reinforcement fixing WIP

55200 RHS BUILDING DISMANTLE WIP

IE visit

Unloading of the test load from 25% to 0% has been completed successfully with the IE team

Unloading of the test load from 25% to 0% has been completed successfully with the IE team

57+100 RHS, Span p16–P17: Vehicle load testing is being conducted. Temperature correction has been started jointly with the IE team.