About Project
The Government of India had entrusted to the Authority the development, maintenance and management of National Highway No. 544D including the section from existing km 39.380 (Design Chainage km 37.000) to km 74.450 (Design Chainage km 69.000) of NH 544D (approx. 32.00 km). The Authority had resolved to augment the existing km 39.380 (Design Chainage km 37.000) to km 74.450 (Design Chainage km 69.000) of NH 544D (approx. 32.00 km) section of Muchukota – Bugga in the state of Andhra Pradesh by Four laning on design, build, operate and transfer (the “Hybrid Annuity”) basis. The pavement is entirely of flexible type and rigid type at Toll Plaza.
Note: The duration for the construction of the project is 730 days from the appointed date with 15 years of operation and maintenance period.
Scope of the Project

30/7 No’s
Box/Pipe Culverts
10 No’s
Vehicular Underpass
2 No’s
Light Vehicular Underpass

10/1 No’s
Minor Bridges/Widening

2 No’s
Major Bridge
Project details and Timeline
4 Lanning of NH 544D from existing km 39.380 of NH 544D (Design Chainage km 37.000) to km 74.450 (Design Chainage km 69.000) of Muchukota – Bugga section of NH-544D on Hybrid Annuity Mode under NH (O), in the state of Andhra Pradesh.
| Role/Type | Details |
|---|---|
| EPC Contractor | M/s. Megha Engineering & Infrastructures Limited |
| Independent Engineer | M/s. Satra Services and Solution Pvt. Ltd |
| Agreement Date | 03rd Feb 2023 |
| Appointed Date | 17th Aug 2023 |
| Maintenance Period | 15 Years after commencing |
| COD Construction Period | 24 Months (730 days) from Appointed Date |
| Project Cost | 733.35 Crs. |
Project highlights
- 4 Laning of NH 544D from existing km 39.380 of NH 544D (Design Chainage km 37.000) to km 74.450 (Design Chainage km 69.000)
- Comes under design, build, operate and Transfer (the DBOT Annuity or Hybrid Annuity).
- Part of Anantapur-Guntur National Highway.
- Design speed of section is 100kmph.
- Provides safe travel and reduce travel time.
Recent updates
Progress Photographs During 2nd week of October-2026
44+400 VUP Junction BC laying 47+300 median plantation watering 53+200 to 500 RHS thermoplastic road marking
Progress Photographs During 1st week of October-2026
42+300 authorised median opening, solar blinker yellow light fixing .56+000 VASD Equipments fixing 53+210 to 53+500 RHS MCW BC laying…
Progress Photographs During 4th week of September-2026
Full VMS Gantry boards 38+250 LHS ATMS full (VMS) gantry fixing
Progress Photographs During 3rd week of September-2026
53+400 ROB P1 to P2 deck slab safety consultant site visit 38+800 RHS compact VMS cantilever fixing 44+855 RHS Service…
Project photos