Progress Photographs During 2nd week of May-2026

44+420 to 44+460 wall3 4th layer RE panel Erection

50+150 to 50+270  wall2 Rolling WIP

MCW WMM RHS 52+540 to 52+670 WIP

43+370 to 43+540 wall3 Emb 29th WIP

50+270 to 50+430 RHS Wall-2, Emb 24th layer

50+530 to 50+460 RHS wall-4, 25th Erection WIP

MCW BC 56+100 to 57+490 RHS WIP

43+350 RE wall A2 Wall-4 RE panel WIP

63+125 PUP RHS Raft

 