About Project

 

4 Laning of NH 544D from existing km 39.380 of NH 544D (Design Chainage km 37.000) to km 74.450 (Design Chainage km 69.000) of Mutssukota —Bugga section of NH-544D on Hybrid Annuity Mode under NH (0), in the state of Andhra Pradesh. 

 

Note: The duration for the construction of the project is 730 days from the appointed date with 15 years of operation and maintenance period.

Scope of the Project

30 No’s

Box/Pipe Culverts

10 No’s

Vehicular Underpass

2 No’s

Light Vehicular Underpass

11 No’s

Minor Bridges

2 No’s

Major Bridge

Project details and Timeline

4 Laning of NH 544D from existing km 39.380 of NH 544D (Design Chainage km 37.000) to km 74.450 (Design Chainage km 69.000) of Mutssukota —Bugga section of NH-544D on Hybrid Annuity Mode under NH (0), in the state of Andhra Pradesh.

HTML Table Generator
Role/Type Details
EPC Contractor  M/s. Megha Engineering & Infrastructures Limited
Independent Engineer  M/s. Satra Services and Solution Pvt. Ltd 
Agreement Date  03rd Feb 2023 
Appointed Date   17th Aug 2023 
Maintenance Period  15 Years after commencing 
COD Construction Period  24 Months (730 days) from Appointed Date 
Project Cost  733.35 Crs. 
Project photos

Project highlights

  • 4 Laning of NH 544D from existing km 39.380 of NH 544D (Design Chainage km 37.000) to km 74.450 (Design Chainage km 69.000)
  • Comes under design, build, operate and Transfer (the DBOT Annuity or Hybrid Annuity).
  • Part of Anantapur-Guntur National Highway.
  • Design speed of section is 100kmph.
  • Provides safe travel and reduce travel time.

Recent updates

Construction of bridge is completed at highway

Construction of bridge is completed at JulekalConstruction of bridge is completed at JulekalConstruction of bridge is completed at JulekalConstruction of…